CPS and UPS systems for SFRS and NUSTAR
The required CPS and UPS modules, as well as the external battery modules, serve as power supply systems. They are installed in 19"-racks. These racks are located along the beamline of the Super-FRS (Superconducting Fragment Separator), either directly at the beamline or in niches. The Super-FRS is part of the FAIR accelerator facility (Facility for Antiproton and Ion Research), which is currently under construction in Darmstadt, Germany. At their operating location, the systems are therefore exposed to increased r...
Buyer
FAIR - Facility for Antiproton and Ion Research in Europe GmbH
Value
Not provided
Published
29 Sept 2026
Closes
29 Oct 2026
Procurement details
Source
TED (EU)
Country
Germany (DE)
Procurement method
Selective
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
31154000
Uninterruptible power supplies
Lots
Lot LOT-0001 CPS and UPS systems for SFRS and NUSTAR
Value not provided
60 pieces of CPS 4 kVA incl. rack rails 7 pieces of UPS 4 kVA incl. rack rails 8 pieces of UPS 7,5 kVA incl. rack rails 15 pieces of External battery expansion box for UPS
Delivery: Darmstadt · DE711 · Germany
Documents
Unlock document linkTED notice 668462-2026
29 Sept 2026
Tender notice · Web page
Procurement documents
Not provided
Bidding documents
Contains information from TED (Tenders Electronic Daily), © European Union, reused under CC BY 4.0.