Construction of New Railway Section from Kriva Palanka to the Border of the Republic of Bulgaria, as part of Corridor VIII
The Contract covers the detailed design and construction of approximately 22.1 km of new single-track railway between Kriva Palanka and the border area with the Republic of Bulgaria, forming Section 3 of Railway Corridor VIII – Eastern Section. The railway will have a maximum design speed of 100 km/h. The Works include Kriva Palanka station, Zidilovo halt/station, 21 tunnels with a total length of approximately 8.5 km, 51 bridges/viaducts with a total length of approximately 5 km, permanent way, earthworks, drainag...
Buyer
Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI)
Value
Not provided
Published
24 Sept 2026
Closes
20 Jan 2027
Procurement details
Source
TED (EU)
Country
North Macedonia (MK)
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45234100
Railway construction works
Lots
Lot LOT-0001 Construction of New Railway Section from Kriva Palanka to the Border of the Republic of Bulgaria, as part of Corridor VIII
Value not provided
The Contract covers the detailed design and construction of approximately 22.1 km of new single-track railway between Kriva Palanka and the border area with the Republic of Bulgaria, forming Section 3 of Railway Corridor VIII – Eastern Section. The railway will have a maximum design speed of 100 km/h. The Works include Kriva Palanka station, Zidilovo halt/st...
Delivery: North Macedonia
Documents
Unlock document linkTED notice 659550-2026
24 Sept 2026
Tender notice · Web page
Procurement documents
Not provided
Bidding documents
Contains information from TED (Tenders Electronic Daily), © European Union, reused under CC BY 4.0.