PS/25/263 - Winter Maintenance Assistance Framework (2026-2033)
The Council requires to establish a Winter Maintenance Assistance Framework for the provision of Contractors assistance during periods of adverse winter weather when all internal resource has been exhausted. The Framework will consist of 5 Lots: Lot 1: Ad Hoc Assistance for Gritting and Snow Clearing Operations within East and South Ayrshire Lot 2: Standby Service for the Provision of Winter Treatment Services on Kilmarnock Town Centre Priority Footways (East Ayrshire) Lot 3: Standby Service for Provision of Winter...
Buyer
East Ayrshire Council
Value
Not provided
Published
1 Sept 2026
Closes
2 Oct 2026
Procurement details
Source
Pcs
Region
UKM93
Procurement method
Open
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
90620000
Snow-clearing services
43313100
Snowploughs
44113910
Winter-maintenance materials
37411000
Winter equipments
34143000
Winter-maintenance vehicles
34144420
Salt spreaders
34927100
Road salt
14450000
Salt in brine
Lots
Lot 1 - Ad Hoc Assistance for Gritting and Snow Clearing Operations within East and South Ayrshire
Lot 1
Value not provided
Lot 1 will consist of Contractors/farmers etc (Service Providers) along with appropriate vehicles, plant and equipment which could be made available during periods of adverse winter weather to assist with winter maintenance operations on an as and when required basis. It is envisaged there will be a maximum of 6 Contractors appointed to this Lot. There can b...
Delivery: UKM93
Lot 2 - Standby Service for the Provision of Winter Treatment Services on Kilmarnock Town Centre Priority Footways (East Ayrshire)
Lot 2
Value not provided
Lot 2 will consist of a single Contractor, who shall provide a Standby winter footway treatment service using liquid de-icer products (which shall be sodium chloride NaCl (Brine) Spray or on instruction a calcium chloride CaCL2 (Brine) spray) on designated priority footways located within the Kilmarnock Town Centre, with 24/7 availability over a 19 week peri...
Delivery: UKM93
Lot 3 - Standby Service for Provision of Winter Treatment Services on Priority Carriageway Routes (East and South Ayrshire)
Lot 3
Value not provided
Lot 3 will consist of Contractors/farmers etc (Service Providers) along with appropriate vehicles, plant or equipment that will be on Standby for allocated specific Priority 1 and Priority 2 Carriageway Routes with 24/7 availability over a 25 week period. It is envisaged there will be there will be a maximum of 4 Contractors appointed to this Lot. Please not...
Delivery: UKM93
Lot 4 - Standby Service for Provision of Winter Treatment Services on Priority Footway Routes (East Ayrshire)
Lot 4
Value not provided
Lot 4 will consist of Contractors/farmers etc (Service Providers) along with appropriate vehicles, plant or equipment that will be on Standby for allocated specific Priority 1 and Priority 2 Footway routes with 24/7 availability over a 19 week period. It is envisaged there will be a maximum of 4 Contractors appointed to this Lot. Please note that Contractors...
Delivery: UKM93
Lot 5 - Ad Hoc Assistance for Gritting and Snow Clearing Operations for Sheltered and Supported Living Accommodation within East Ayrshire
Lot 5
Value not provided
Lot 5 will consist of a single Contractor along with appropriate vehicles, plant or equipment which could be made available during periods of adverse winter weather to assist with winter maintenance operations for Sheltered and Supported Living Accommodation within East Ayrshire on an as and when required basis, for gritting of footpaths and car parks. White...
Delivery: UKM93
Document metadata
PS/25/263 - Winter Maintenance Assistance Framework (2026-2033)
The Council requires to establish a Winter Maintenance Assistance Framework for the provision of Contractors assistance during periods of adverse winter weather when all internal resource has been exhausted. The Framework will consist of 5...
contractNotice · text/html
Not provided
Unlock document link