A98 Banff Bridge Scour Protection Works
Replacement of existing rock rip rap scour protection at A98 Banff Bridge with an engineered rock roll mattress. These works will also increase the extent of the protection both upstream and downstream.
Buyer
Aberdeenshire Council
Value
£2,000,000
Published
30 Oct 2024
Closes
11 Dec 2024
Procurement details
Source
Pcs
Region
Aberdeen City and Aberdeenshire
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45244000
Marine construction works
45221100
Construction work for bridges
45243000
Coastal-defence works
45221000
Construction work for bridges and tunnels, shafts and subways
45221110
Bridge construction work
45221111
Road bridge construction work
Lots
Lot 1 A98 Banff Bridge Scour Protection Works
Value not provided
Procurement of scour protection works to Banff Bridge which is located within the tidal zone at the mouth of the River Deveron.
Delivery: Aberdeen City and Aberdeenshire
Documents
Unlock document linkA98 Banff Bridge Scour Protection Marine Licence Consultation (Indicative)
18 Oct 2024
A98 Banff Bridge Scour Protection Works
Not provided
Replacement of existing rock rip rap scour protection at A98 Banff Bridge with an engineered rock roll mattress. These works will also increase the extent of the protection both upstream and downstream.
Contract notice · Web page
Drawing - Location Plan
30 Oct 2024
Drawing - Site Extents
30 Oct 2024
Drawing - Existing Arrangement
30 Oct 2024
Drawing - Indicative Construction Sequence - Option 1
30 Oct 2024
Drawing - Indicative Construction Sequence - Option 2
30 Oct 2024
Drawing - Proposed General Arrangement
30 Oct 2024
Drawing - Construction Details
30 Oct 2024
Drawing - Dowel Plate Detail
30 Oct 2024
Drawing - Scour Monitoring
30 Oct 2024
INNS Management Plan
30 Oct 2024
Contains public sector information licensed under the Open Government Licence v3.0.