A939 Luib Bridge River Realignment
The existing river alignment is to be returned to the original as built alignment by method of large wood engineering structures. These comprise training structures and bank reinforcement structures to be constructed of sitka spruce stems with root plates attached which are provided and currently stored on site. Sediment grading is to be carried out within the new channel up to 200m upstream of Luib Bridge and up to 80m downstream of the bridge. The old channel is to be infilled, bank reprofiling to be carried out...
Buyer
Aberdeenshire Council
Value
£85,000
Published
5 Jun 2024
Closes
19 Jun 2024
Procurement details
Source
Pcs
Region
Aberdeen City and Aberdeenshire
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45200000
Works for complete or part construction and civil engineering work
Lots
Lot 1 A939 Luib Bridge River Realignment
Value not provided
River realignment works
Delivery: Aberdeen City and Aberdeenshire
Documents
Unlock document linkA939 Luib Bridge River Realignment
Not provided
The existing river alignment is to be returned to the original as built alignment by method of large wood engineering structures. These comprise training structures and bank reinforcement structures to be constructed of sitka spruce stems w...
Contract notice · Web page
A939 Luib Bridge River Realignment
5 Jun 2024
Word document
Common Assessment Question Set
5 Jun 2024
Word document
Method Statement as referenced in Statement of Requirements
11 Jun 2024
drawings 2150192_240527_DD01 - 07 as referenced in Statement of Requirements
11 Jun 2024
Luib specific question set Removes duplication with SPD and must be completed as part of submission
17 Jun 2024
Word document
Contains public sector information licensed under the Open Government Licence v3.0.