Open Tenderocds-r6ebe6-0000768040

A939 Luib Bridge River Realignment

The existing river alignment is to be returned to the original as built alignment by method of large wood engineering structures. These comprise training structures and bank reinforcement structures to be constructed of sitka spruce stems with root plates attached which are provided and currently stored on site. Sediment grading is to be carried out within the new channel up to 200m upstream of Luib Bridge and up to 80m downstream of the bridge. The old channel is to be infilled, bank reprofiling to be carried out...

Buyer

Aberdeenshire Council

Value

£85,000

Published

5 Jun 2024

Closes

19 Jun 2024

Procurement details

Source

Pcs

Region

Aberdeen City and Aberdeenshire

Procurement method

Open

Category

Works

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

45200000

Works for complete or part construction and civil engineering work

Lots

Lot 1 A939 Luib Bridge River Realignment

Value not provided

River realignment works

Delivery: Aberdeen City and Aberdeenshire

A939 Luib Bridge River Realignment

Not provided

The existing river alignment is to be returned to the original as built alignment by method of large wood engineering structures. These comprise training structures and bank reinforcement structures to be constructed of sitka spruce stems w...

Contract notice · Web page

A939 Luib Bridge River Realignment

5 Jun 2024

Word document

Common Assessment Question Set

5 Jun 2024

Word document

Method Statement as referenced in Statement of Requirements

11 Jun 2024

PDF

drawings 2150192_240527_DD01 - 07 as referenced in Statement of Requirements

11 Jun 2024

PDF

Luib specific question set Removes duplication with SPD and must be completed as part of submission

17 Jun 2024

Word document

Contains public sector information licensed under the Open Government Licence v3.0.