Batchen Lane Car Park Phase 2
In 2021 the asphalt surface of Level 2 & 4 of Batchen Lane car park was removed and replaced with a surface waterproofing system (Decseal). Due to poor surface preparation and installation a full replacement of level two and four, split level and ramps leading to it is required. In 2023 the waterproofing to level 2 and the exit ramp was replaced. This project will require the surfacing of level 4; including the ramps and mezzanine floor leading up to it, to be replaced. The surface water drainage and expansion join...
Buyer
Moray Council
Value
£250,000
Published
28 Mar 2024
Closes
26 Apr 2024
Procurement details
Source
Pcs
Region
Inverness & Nairn and Moray, Badenoch & Strathspey
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45200000
Works for complete or part construction and civil engineering work
Lots
Lot 1 Batchen Lane Car Park Phase 2
£250,000
Open tender for surfacing of level 4 of Batchen Lane Car Park, Elgin, Moray. Economic operators may be excluded from this competition if they are in any of the situations referred to in regulation 8 and 9 of the Procurement (Scotland) Regulations 2016.
Delivery: Inverness & Nairn and Moray, Badenoch & Strathspey
Documents
Unlock document linkBatchen Lane Car Park Phase 2
Not provided
In 2021 the asphalt surface of Level 2 & 4 of Batchen Lane car park was removed and replaced with a surface waterproofing system (Decseal). Due to poor surface preparation and installation a full replacement of level two and four, split lev...
Contract notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.