District Energy Transmission Pipeline - Feasibility Study and Design to RIBA Stage 3
Aberdeen City Council is seeking proposals from suitably qualified and experienced individuals or organisations to act as a Technical Consultant to Aberdeen City Council and Aberdeen Heat and Power in respect to developing a District Energy Transmission Pipeline Route from the NESS Energy from Waste facility located at the East Tullos industrial estate to the City Centre.
Buyer
Aberdeen City Council
Value
£150,000
Published
28 Nov 2023
Closes
15 Jan 2024
Procurement details
Source
Pcs
Region
Aberdeen City and Aberdeenshire
Procurement method
Open
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
71320000
Engineering design services
09323000
District heating
71311000
Civil engineering consultancy services
71311300
Infrastructure works consultancy services
71313000
Environmental engineering consultancy services
71322000
Engineering design services for the construction of civil engineering works
71322200
Pipeline-design services
71312000
Structural engineering consultancy services
Lots
Lot 1 District Energy Transmission Pipeline - Feasibility Study and Design to RIBA Stage 3
£150,000
The purpose of this Invitation to Tender is to seek proposals from suitably qualified and experienced individuals or organisations to act as a Technical Consultant to Aberdeen City Council (ACC) and Aberdeen Heat and Power (AHP) in respect to developing a District Energy Transmission Pipeline Route from the NESS Energy from Waste (EfW) facility located at th...
Delivery: Aberdeen City and Aberdeenshire
Documents
Unlock document linkDistrict Energy Transmission Pipeline - Feasibility Study and Design to RIBA Stage 3
Not provided
Aberdeen City Council is seeking proposals from suitably qualified and experienced individuals or organisations to act as a Technical Consultant to Aberdeen City Council and Aberdeen Heat and Power in respect to developing a District Energy...
Contract notice · Web page
ITT - District Energy Transmission Pipeline - Feasibility Study and Detailed Project Development
28 Nov 2023
SPD Document
28 Nov 2023
Word document
Appendix 1 - Statement of Requirements
28 Nov 2023
Appendix 2 - Pricing Schedule
28 Nov 2023
Word document
Appendix 3 - Declaration
28 Nov 2023
Word document
Appendix 4 - ACC Standard Terms and Conditions - Provision of Services (May 2022)
28 Nov 2023
Appendix 5 - Award Questionnaire
28 Nov 2023
Appendix 6 - Supplier Participation Agreement
28 Nov 2023
Word document
Appendix 1 - Attachment 1a - Existing Energy Loads
28 Nov 2023
Appendix 1 - Attachment 1b - Existing Generation Facilities
28 Nov 2023
Appendix 1 - Attachment 2a - Network Details Sheet 1
28 Nov 2023
Contains public sector information licensed under the Open Government Licence v3.0.