2549 - Design Services for CPI Coxon Building expansion to existing pharmaceutical laboratories
CPI requires an Design Team to work with the team at CPI to develop an optimised design for expansion of the current research facility. This will include an extension into the courtyard between the National Formulation Centre and the National Centre for Healthcare Photonics, and a redesign of existing laboratory to make best use of the space available. The expected output is a detailed design plan ready to send to a building contractor combined with a cost and time estimate for the building works. Please refer to t...
Buyer
CENTRE FOR PROCESS INNOVATION LIMITED
Value
£60,000
Published
12 Jan 2023
Closes
5 Sept 2022
Procurement details
Source
Pcs
Region
South Teesside
Procurement method
Selective
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
71200000
Architectural and related services
Lots
Lot 1 2549 - Design Services for CPI Coxon Building expansion to existing pharmaceutical laboratories
£60,000
CPI require a fully coordinated design team to provide architectural and engineering design services with expertise for pharmaceutical operations and functionality to i) Develop an optimised design of the Expansion of the current research facility, this will include an extension into the courtyard between the NFC and the NCHP, and a redesign of existing labo...
Delivery: North East (England)
Documents
Unlock document link2549 - Design Services for CPI Coxon Building expansion to existing pharmaceutical laboratories
Not provided
CPI requires an Design Team to work with the team at CPI to develop an optimised design for expansion of the current research facility. This will include an extension into the courtyard between the National Formulation Centre and the Nation...
Contract notice · Web page
Tender Pack
19 Aug 2022
ZIP archive
Appendix Docs
19 Aug 2022
ZIP archive
2549 - Design Services for CPI Coxon Building expansion to existing pharmaceutical laboratories
Not provided
CPI requires an Design Team to work with the team at CPI to develop an optimised design for expansion of the current research facility. This will include an extension into the courtyard between the National Formulation Centre and the Nation...
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.