Supply of One New Towage Boat (Design and Build)
Orkney Islands Council, as Statutory Harbour Authority (the “Authority”) has a requirement for the supply of one design and build tug boat which meets the Council’s specification, which are required to provide a safe and reliable towage service in the Scapa Flow (including Flotta Oil Terminal) and Kirkwall harbour areas.
Buyer
ORKNEY ISLANDS COUNCIL
Value
£7,500,000
Published
28 Sept 2022
Closes
4 Jul 2022
Procurement details
Source
Pcs
Region
United Kingdom
Procurement method
Open
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
34513200
Tug boats
34521000
Specialised boats
34520000
Boats
Lots
Lot 1 Supply of One New Tug Boat (Design and Build) - Currently Under Construction
£7,500,000
The Basic Specification is given as a guide as to the specific requirements of the Owner. 1.1. The principal dimensions of the vessel are expected to be approximately as follows:- Length overall : +/- 32 metres Breadth extreme : 12 to 14 metres Operating draft : MAXIMUM of 5.50 metres (navigational draft), when fully loaded with fuel and FW 1.2. The vessel i...
Delivery: Orkney Islands
Lot 2 Supply of One New Tug Boat (Design and Build)
£7,500,000
The provision (design and build) of one new-build tug boat to meet the Council’s specification as detailed in Lot 1, apart from the main engines which must be:- IMO Tier III Caterpillar 3516E or equivalent. This option (Lot 2) to include total cost of supply and fit out of associated after treatment equipment such as but not limited to Clean Emissions Module...
Delivery: Orkney Islands
Documents
Unlock document linkSupply of One New Towage Boat (Design and Build)
Not provided
Orkney Islands Council, as Statutory Harbour Authority (the “Authority”) has a requirement for the supply of one design and build tug boat which meets the Council’s specification, which are required to provide a safe and reliable towage ser...
Contract notice · Web page
Invitation to Tender Documentation
2 Jun 2022
Word document
Method Statement
2 Jun 2022
Excel spreadsheet
Evaluation Criteria
2 Jun 2022
Excel spreadsheet
Outline Vessel Specification
2 Jun 2022
Word document
Compliance Statement
2 Jun 2022
Word document
Price Schedule
2 Jun 2022
Word document
Whole Life Costing Spreadsheet
2 Jun 2022
Excel spreadsheet
Supply of One New Towage Boat (Design and Build)
Not provided
Orkney Islands Council, as Statutory Harbour Authority (the “Authority”) has a requirement for the supply of one design and build tug boat which meets the Council’s specification, which are required to provide a safe and reliable towage ser...
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.