Awarded Contractocds-r6ebe6-0000695032

Supply of One New Towage Boat (Design and Build)

Orkney Islands Council, as Statutory Harbour Authority (the “Authority”) has a requirement for the supply of one design and build tug boat which meets the Council’s specification, which are required to provide a safe and reliable towage service in the Scapa Flow (including Flotta Oil Terminal) and Kirkwall harbour areas.

Buyer

ORKNEY ISLANDS COUNCIL

Value

£7,500,000

Published

28 Sept 2022

Closes

4 Jul 2022

Procurement details

Source

Pcs

Region

United Kingdom

Procurement method

Open

Category

Goods

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

34513200

Tug boats

34521000

Specialised boats

34520000

Boats

Lots

Lot 1 Supply of One New Tug Boat (Design and Build) - Currently Under Construction

£7,500,000

The Basic Specification is given as a guide as to the specific requirements of the Owner. 1.1. The principal dimensions of the vessel are expected to be approximately as follows:- Length overall : +/- 32 metres Breadth extreme : 12 to 14 metres Operating draft : MAXIMUM of 5.50 metres (navigational draft), when fully loaded with fuel and FW 1.2. The vessel i...

Delivery: Orkney Islands

Lot 2 Supply of One New Tug Boat (Design and Build)

£7,500,000

The provision (design and build) of one new-build tug boat to meet the Council’s specification as detailed in Lot 1, apart from the main engines which must be:- IMO Tier III Caterpillar 3516E or equivalent. This option (Lot 2) to include total cost of supply and fit out of associated after treatment equipment such as but not limited to Clean Emissions Module...

Delivery: Orkney Islands

Supply of One New Towage Boat (Design and Build)

Not provided

Orkney Islands Council, as Statutory Harbour Authority (the “Authority”) has a requirement for the supply of one design and build tug boat which meets the Council’s specification, which are required to provide a safe and reliable towage ser...

Contract notice · Web page

Invitation to Tender Documentation

2 Jun 2022

Word document

Method Statement

2 Jun 2022

Excel spreadsheet

Evaluation Criteria

2 Jun 2022

Excel spreadsheet

Outline Vessel Specification

2 Jun 2022

Word document

Compliance Statement

2 Jun 2022

Word document

Price Schedule

2 Jun 2022

Word document

Whole Life Costing Spreadsheet

2 Jun 2022

Excel spreadsheet

Supply of One New Towage Boat (Design and Build)

Not provided

Orkney Islands Council, as Statutory Harbour Authority (the “Authority”) has a requirement for the supply of one design and build tug boat which meets the Council’s specification, which are required to provide a safe and reliable towage ser...

Award notice · Web page

Contains public sector information licensed under the Open Government Licence v3.0.