Peatland Hydrological Restoration Works RSPB Forsinard 2022/23
Re-profiling in areas previously furrow blocked with full height dams. Sphagnum moss that has colonised the drains should be removed from the drains before infilling and placed on top of the newly reprofiled surface. Infilling will be achieved by firstly crushing down all dead tree material so that all stems and branches lie in the bottom of the furrows and below the height of the original ground surface (i.e. the section between the ploughthrows). The excavator will then use a bucket to pull stumps, brash and ridg...
Buyer
RSPB Scotland
Value
£132,323
Published
8 Jul 2022
Closes
13 Jun 2022
Procurement details
Source
Pcs
Region
UKM92
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45112500
Earthmoving work
Lots
Lot 1 Peatland Hydrological Restoration Works RSPB Forsinard 2022/23
£132,323
Re-profiling in areas previously furrow blocked with full height dams. Sphagnum moss that has colonised the drains should be removed from the drains before infilling and placed on top of the newly reprofiled surface. Infilling will be achieved by firstly crushing down all dead tree material so that all stems and branches lie in the bottom of the furrows and...
Delivery: Caithness & Sutherland and Ross & Cromarty
Documents
Unlock document linkPeatland Hydrological Restoration Works RSPB Forsinard 2022/23
Not provided
Re-profiling in areas previously furrow blocked with full height dams. Sphagnum moss that has colonised the drains should be removed from the drains before infilling and placed on top of the newly reprofiled surface. Infilling will be achie...
Contract notice · Web page
Peatland Hydrological Restoration Works Tender RSPB Forsinard 2022/2023
16 May 2022
Word document
Map of Hydrological Restoration Work
16 May 2022
JPEG image
Peatland Hydrological Restoration Works RSPB Forsinard 2022/23
Not provided
Re-profiling in areas previously furrow blocked with full height dams. Sphagnum moss that has colonised the drains should be removed from the drains before infilling and placed on top of the newly reprofiled surface. Infilling will be achie...
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.