Electric Vehicle (EV) Charging Network Refresh
Five of CMAL’s Ferry Terminals have eVolt 50kW Electric Vehicle (EV) charging units installed on site that are showing signs of excessive general wear and corrosion and require replacement with similar sized, updated units.
Buyer
Caledonian Maritime Assets Ltd (Utility)
Value
£231,820
Published
13 Sept 2022
Closes
5 Apr 2022
Procurement details
Source
Pcs
Region
UKM83
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45317000
Other electrical installation work
34144900
Electric vehicles
31158100
Battery chargers
Lots
Lot 1 Electric Vehicle (EV) Charging Network Refresh
£231,820
Five of CMAL’s Ferry Terminals have eVolt 50kW Electric Vehicle (EV) charging units installed on site that are showing signs of excessive general wear and corrosion and require replacement with similar sized, updated units.
Delivery: Scotland
Documents
Unlock document linkElectric Vehicle (EV) Charging Network Refresh
Not provided
Five of CMAL’s Ferry Terminals have eVolt 50kW Electric Vehicle (EV) charging units installed on site that are showing signs of excessive general wear and corrosion and require replacement with similar sized, updated units.
Contract notice · Web page
Electric Vehicle (EV) Charging Network Refresh
Not provided
Five of CMAL’s Ferry Terminals have eVolt 50kW Electric Vehicle (EV) charging units installed on site that are showing signs of excessive general wear and corrosion and require replacement with similar sized, updated units.
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.