Award of ENV0443 N75 Lady Octavia to Sinclair Street Cycle Route
Site ClearanceAll overgrown vegetation over the entire length is to be cut back to expose the edging of the existing cycle path network. The existing cobbled edging is to be removed. The vegetation is to be cut back a minimum of 1m from the existing edging to help with path extension. All cleared material is to be disposed of off-site.EarthworksThe existing path surfacing will be fully excavated and disposed of off-site. The Contractor shall identify if the make-up beneath the existing surfacing is suitable for re-...
Buyer
Inverclyde Council
Value
£58,930
Published
24 Aug 2021
Closes
24 Aug 2021
Procurement details
Source
Pcs
Region
UKM83
Procurement method
Not provided
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
No CPV codes are available for this public record.
Lots
Lot default Award of ENV0443 N75 Lady Octavia to Sinclair Street Cycle Route
£58,930
Site ClearanceAll overgrown vegetation over the entire length is to be cut back to expose the edging of the existing cycle path network. The existing cobbled edging is to be removed. The vegetation is to be cut back a minimum of 1m from the existing edging to help with path extension. All cleared material is to be disposed of off-site.EarthworksThe existing...
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.