NEC3 Clyde Bridge Replacement Project
South Lanarkshire Council are proceeding with the construction of a 90-metre single span proprietary steel bridge to replace the existing reinforced concrete bridge structure, subject to the Council acquiring the land required for the project as set out below. The proposed structure includes a 4.2m wide carriageway with an additional footway of minimum width 1.05m. The new structure will be constructed off-line of the existing bridge. The proposed carriageway on approach to the structure will follow a new alignment...
Buyer
South Lanarkshire Council
Value
£3,800,000
Published
17 Feb 2021
Closes
16 Apr 2021
Procurement details
Source
Pcs
Region
UKM95
Procurement method
Selective
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45000000
Construction work
45111100
Demolition work
Lots
Lot 1 NEC3 Clyde Bridge Replacement Project
£3,800,000
The conditions of contract will be NEC3 Engineering and Construction Contract (ECC), Option B. Reference should be made to any experience of the NEC ECC Option B, other options or other NEC contracts. Experience in other forms of contract which incorporate similar principals of contract management as the NEC can be used. A restricted tendering procurement pr...
Delivery: UKM95
Documents
Unlock document linkNEC3 Clyde Bridge Replacement Project
Not provided
South Lanarkshire Council are proceeding with the construction of a 90-metre single span proprietary steel bridge to replace the existing reinforced concrete bridge structure, subject to the Council acquiring the land required for the proje...
Contract notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.