Main Road & Infrastructure Works, Staneyhill, Shetland (WS1)
This contract is for carrying out the necessary site clearance, rock excavation, groundworks, landscaping, providing access roads, pavements, water, power etc. to enable the construction of new build housing developments.
Buyer
Hjaltland Housing Association Ltd
Value
£7,500,000
Published
21 Dec 2020
Closes
29 Jan 2021
Procurement details
Source
Pcs
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45200000
Works for complete or part construction and civil engineering work
45000000
Construction work
45111200
Site preparation and clearance work
45111210
Blasting and associated rock-removal work
Lots
Lot 1 Main Road & Infrastructure Works, Staneyhill, Shetland (WS1)
£7,500,000
This procurement is for the installation of the main spine road and green corridor including all necessary utilities such as water, power, telecoms and drainage systems. The work includes the excavation of a significant amount of rock for processing and use on the new spine road construction. It is envisaged the rock will be excavated by means of low level b...
Delivery: Shetland Islands
Documents
Unlock document linkMain Road & Infrastructure Works, Staneyhill, Shetland (WS1)
Not provided
This contract is for carrying out the necessary site clearance, rock excavation, groundworks, landscaping, providing access roads, pavements, water, power etc. to enable the construction of new build housing developments.
Contract notice · Web page
1085 Issue Sheet Green Corridor 01 Tender Issue 2020.12.17
23 Dec 2020
GC01 Green Corridor Proposed Landscape Layout Plan_Rev B_Issued 2020.10.29_Billing_a1size
23 Dec 2020
GC02 Green Corridor Proposed Landscape Sections Plan_Rev B_Issued 2020.10.29_Billing_a1size
23 Dec 2020
GC03 Green Corridor Proposed Landscape Planting Plan_Issued 2020.10.29_Billing_a1size
23 Dec 2020
GC04 Green Corridor Rocky Swale Layout - Planting Plan_Issued 2020.10.29_Billing_a3size
23 Dec 2020
GC05 Green Corridor Proposed Topsoil Depths_Issued 2020.10.29_Billing_a1size
23 Dec 2020
GC06 Green Corridor Typical Inverted Raised Turve Planting Detail_Issued 2020.10.29_Billing_a4size
23 Dec 2020
GC07 Green Corridor Hazel Framed Hurdle Detail_Issued 2020.10.29_Billing_a4size
23 Dec 2020
GC08 Green Corridor Amphitheatre Detailed Layout - Levels Plan _Issued 2020.10.29_Billing_a1size
23 Dec 2020
GC09 Amphitheatre Insitu Concrete Steps Terraces PCC Steps Details and Sections a1size
23 Dec 2020
GC10 Green Corridor Amphitheatre Insitu Concrete Steps Handrail_Issued 2020.10.29_Billing_a3size
23 Dec 2020
Contains public sector information licensed under the Open Government Licence v3.0.