CMAL0250 Colintraive Outfall Works pt2
A new drainage system was provided when the new marshalling and car parking areas were constructed as part of the upgrade works at the ferry terminal in 2018. The new outfall headwall built as part of the upgrade is completely buried by beach material during winter storms. The proposed works are being undertaken in order to remove the existing outfall headwall and construct a new outfall further down the beach. This will prevent the outfall being buried and will ensure the integrity of the drainage system in years...
Buyer
Caledonian Maritime Assets Ltd (Utility)
Value
£19,630
Published
14 Oct 2020
Closes
14 Sept 2020
Procurement details
Source
Pcs
Region
UKM83
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45232450
Drainage construction works
Lots
Lot 1 CMAL0250 Colintraive Outfall Works pt2
£19,630
A new drainage system was provided when the new marshalling and car parking areas were constructed as part of the upgrade works at the ferry terminal in 2018. The new outfall headwall built as part of the upgrade is completely buried by beach material during winter storms. The proposed works are being undertaken in order to remove the existing outfall headwa...
Delivery: Lochaber, Skye & Lochalsh, Arran & Cumbrae and Argyll & Bute
Documents
Unlock document linkCMAL0250 Colintraive Outfall Works pt2
Not provided
A new drainage system was provided when the new marshalling and car parking areas were constructed as part of the upgrade works at the ferry terminal in 2018. The new outfall headwall built as part of the upgrade is completely buried by bea...
Contract notice · Web page
CMAL0250 - ITQ
4 Sept 2020
Word document
H&S Questionnaire
4 Sept 2020
Word document
Contract Data & Price List
4 Sept 2020
Word document
Scope
4 Sept 2020
Word document
Site Information
4 Sept 2020
Word document
Pre-Construction Information
4 Sept 2020
Word document
RHD-MS_PLAN
4 Sept 2020
Drawing 1
4 Sept 2020
Drawing 2
4 Sept 2020
CMAL0250 Colintraive Outfall Works pt2
Not provided
A new drainage system was provided when the new marshalling and car parking areas were constructed as part of the upgrade works at the ferry terminal in 2018. The new outfall headwall built as part of the upgrade is completely buried by bea...
Award notice · Web page