Award of 714_0698 - Garrogill harvest facilities & Rivox pothole repairs
Dear supplier.We are inviting quotes for Harvesting ramps that are required off the top side and lower side of the existing forest road at Garrogill, near Moffat. The works will involve excavation into the hillside and excavation into the lower spoil berm to form cut and fill ramps. The ramps, numbering 6 in total, will vary in length from 6 - 15m, and are to be stoned up with as-dug stone won and uplifted from FLS Garrogill quarry.The Rivox repairs will require a grader and roller to work through the route from Au...
Buyer
Forestry and Land Scotland
Value
£11,160
Published
23 Apr 2020
Closes
5 Jul 2020
Procurement details
Source
Pcs
Region
Scotland
Procurement method
Not provided
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
No CPV codes are available for this public record.
Lots
Lot default Award of 714_0698 - Garrogill harvest facilities & Rivox pothole repairs
£11,160
Dear supplier.We are inviting quotes for Harvesting ramps that are required off the top side and lower side of the existing forest road at Garrogill, near Moffat. The works will involve excavation into the hillside and excavation into the lower spoil berm to form cut and fill ramps. The ramps, numbering 6 in total, will vary in length from 6 - 15m, and are t...
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.