Hangar Refurbishment at Stornoway Airport
Due to the age and ongoing safety issues with the fabric of the Hangar roof, several surveys have been undertaken at various stage to identify structural weaknesses. There are issues with the doors in both gables with corrosion to the cladding and steel frame, and there are issues internally associated with water ingress. HIAL are proceeding with the appointment of a main Contractor to undertake the rehabilitation works to Gaydon Hanger as part of the investment strategy for the airport.
Buyer
Highlands and Islands Airports Limited
Value
Not provided
Published
16 Mar 2020
Closes
24 Apr 2020
Procurement details
Source
Pcs
Region
Highlands and Islands
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45213351
Maintenance hangar construction work
45262650
Cladding works
Lots
Lot 1 Hangar Refurbishment at Stornoway Airport
Value not provided
Due to the age and ongoing safety issues with the fabric of the Hangar roof, several surveys have been undertaken at various stage to identify structural weaknesses. There are issues with the doors in both gables with corrosion to the cladding and steel frame, and there are issues internally associated with water ingress. HIAL are proceeding with the appoint...
Delivery: Eilean Siar (Western Isles)
Documents
Unlock document linkHangar Refurbishment at Stornoway Airport
Not provided
Due to the age and ongoing safety issues with the fabric of the Hangar roof, several surveys have been undertaken at various stage to identify structural weaknesses. There are issues with the doors in both gables with corrosion to the cladd...
Contract notice · Web page
Tender Response template
16 Mar 2020
Word document
NEC ECC Activity Schedule template
16 Mar 2020
Excel spreadsheet
Evaluation Scoring Matrix model
16 Mar 2020
Excel spreadsheet
Draft Contract
16 Mar 2020
Word document
NEC ECC Contract Data Part 2 template
16 Mar 2020
Word document
WI - Protected Surfaces Plan
16 Mar 2020
WI - Hangar Ground Floor Plan
16 Mar 2020
SI - Pre-Construction Information
16 Mar 2020
SI - Feasibility Study
16 Mar 2020
SI - CAA CAP 169
16 Mar 2020
EASA CAP1168 Guidance
16 Mar 2020
Contains public sector information licensed under the Open Government Licence v3.0.