A92 Bervie Jubilee Bridge - Half Joint Monitoring System
Design, fabricate and install a system to monitor the movement of identified half-joints in a concrete bridge. Data should be live streamed and collated for analysis, to aid in the whole life management and maintenance of the bridge. The system should be able to track longitudinal and transverse movement along with vertical displacements. The system should also be able to monitor identified re-entrant cracks for deterioration. The system will include monitoring and annual reporting of the findings for a minimum of...
Buyer
Aberdeenshire Council
Value
Not provided
Published
18 Sept 2019
Closes
18 Sept 2019
Procurement details
Source
Pcs
Region
Aberdeen City and Aberdeenshire
Procurement method
Not provided
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
71630000
Technical inspection and testing services
71311210
Highways consultancy services
71312000
Structural engineering consultancy services
71311000
Civil engineering consultancy services
Lots
Lot 1 A92 Bervie Jubilee Bridge - Half Joint Monitoring System
Value not provided
Tender
Delivery: Aberdeen City and Aberdeenshire
Documents
Unlock document linkA92 Bervie Jubilee Bridge - Half Joint Monitoring System
Not provided
Design, fabricate and install a system to monitor the movement of identified half-joints in a concrete bridge. Data should be live streamed and collated for analysis, to aid in the whole life management and maintenance of the bridge. The sy...
Planned procurement notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.