10638 Staff Facilities and Letham Hall Boiler Replacement at HMP Barlinnie
5No. Low Temperature Hot Water boilers generate the hot water that serves the existing heating system within the Staff Facilities building. 4No. Low Temperature Hot Water boilers generate the hot water that serves the existing heating systems within Letham Hall. All boilers within the Staff Facilities building and 2No. boilers within Letham Hall (Level 1) have reached the end of their economic life and require replacement. This project provides for the replacement of the LTHW boilers within the Staff Facilities and...
Buyer
Scottish Prison Service
Value
Not provided
Published
10 Jun 2019
Closes
5 Jul 2019
Procurement details
Source
Pcs
Region
UKM75
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
42160000
Boiler installations
Lots
Lot 1 10638 Staff Facilities and Letham Hall Boiler Replacement at HMP Barlinnie
Value not provided
The SPS has commenced this procurement process in good faith and with the intention of awarding a contract. Following publication of the Contract Notice, an Invitation to Tender (ITT) including the European Single Procurement Document (ESPD) will be published by SPS and will be made available to bidders. Tender responses will then be evaluated by the SPS in...
Delivery: UKM82
Documents
Unlock document link10638 Staff Facilities and Letham Hall Boiler Replacement at HMP Barlinnie
Not provided
5No. Low Temperature Hot Water boilers generate the hot water that serves the existing heating system within the Staff Facilities building. 4No. Low Temperature Hot Water boilers generate the hot water that serves the existing heating syste...