Dykebar Hospital - Upgrade of Main Steam Boiler Plantroom
The purpose of this project is to install new LTHW heating boiler plant (within existing steam plant room), and associated pumped distribution, to interconnect with the existing LTHW heating circuits locally at each Steam/LTHW calorifier. This will effectively render the existing steam plant redundant, thereby enabling future removal of same by NHS GG&C at a later date (i.e. out with this Contract).
Buyer
NHS Greater Glasgow and Clyde
Value
£150,000
Published
7 Mar 2019
Closes
15 Mar 2019
Procurement details
Source
Pcs
Region
UKM82
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45220000
Engineering works and construction works
Lots
Lot 1 Dykebar Hospital - Upgrade of Main Steam Boiler Plantroom
£150,000
The purpose of this project is to install new LTHW heating boiler plant (within existing steam plant room), and associated pumped distribution, to interconnect with the existing LTHW heating circuits locally at each Steam/LTHW calorifier. This will effectively render the existing steam plant redundant, thereby enabling future removal of same by NHS GG&C at a...
Delivery: UKM83
Documents
Unlock document linkDykebar Hospital - Upgrade of Main Steam Boiler Plantroom
Not provided
The purpose of this project is to install new LTHW heating boiler plant (within existing steam plant room), and associated pumped distribution, to interconnect with the existing LTHW heating circuits locally at each Steam/LTHW calorifier. T...
Contract notice · Web page
Main Specification
7 Mar 2019
Pricing schedule
7 Mar 2019
Drawing No M500
7 Mar 2019
Contains public sector information licensed under the Open Government Licence v3.0.