Housing Unit for PEM Electrolyser
We are looking for a housing unit to cover a control unit and electrolyser. The control unit has a foot print of a 20-foot container and the electrolyser will have a foot print of a 40-foot container. The current plan is that the control unit and electrolyser will go along side the current set up at site (1.4.2 Site Layout). The housing will only enclose the new control unit and electrolyser, there must be enough room around the control unit and electrolyser to allow maintenance work to be completed. There will als...
Buyer
European Marine Energy Centre (EMEC) Ltd
Value
Not provided
Published
28 Feb 2019
Closes
28 Feb 2019
Procurement details
Source
Pcs
Region
Orkney Islands
Procurement method
Not provided
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45213200
Construction work for warehouses and industrial buildings
24111600
Hydrogen
39173000
Storage units
44614300
Container storage system
44211000
Prefabricated buildings
44211100
Modular and portable buildings
Lots
Lot 1 Housing Unit for PEM Electrolyser
Value not provided
Below is a list of requirements which the modular unit will need to conform to; 1. Basic considerations for the safety of hydrogen systems - ISO 15916:2015 2. 3-meter height planning restriction 3. Paint Specification – ISO 12944 4. Colour – 6005 RAL 5. ATEX Zone 6. Corrosive environment 7. Survive the severe weather on Orkney
Delivery: Orkney Islands
Documents
Unlock document link1 Pager for Housing Unit
28 Feb 2019
Site Layout
28 Feb 2019
Housing Unit for PEM Electrolyser
Not provided
We are looking for a housing unit to cover a control unit and electrolyser. The control unit has a foot print of a 20-foot container and the electrolyser will have a foot print of a 40-foot container. The current plan is that the control un...
Planned procurement notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.