HWU1700 Library Interim Upgrade Main Contractor

The first phase of the Cameron Smail Library was built in 1974, later phase being completed in 1987. The design is based on large open plan floor plates with a central core for books and perimeter study spaces. The building’s construction comprises generally of an in-situ reinforced concrete frame supported on pad foundations. The building is clad in non-loadbearing brickwork with large single-glazed panels to the west, north and east façades and more limited glazing to the southern aspect. The project involves ref...

Buyer

Heriot Watt University

Value

£4,000,000

Published

18 Jan 2017

Closes

17 Feb 2017

Procurement details

Source

Pcs

Region

United Kingdom

Procurement method

Selective

Category

Works

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

45210000

Building construction work

45214000

Construction work for buildings relating to education and research

45214400

Construction work for university buildings

Lots

Lot 1 HWU1700 Library Interim Upgrade Main Contractor

£4,000,000

The first phase of the Cameron Smail Library was built in 1974, later phase being completed in 1987. The design is based on large open plan floor plates with a central core for books and perimeter study spaces. The building’s construction comprises generally of an in-situ reinforced concrete frame supported on pad foundations. The building is clad in non-loa...

Delivery: Edinburgh, City of

HWU1700 Library Interim Upgrade Main Contractor

Not provided

The first phase of the Cameron Smail Library was built in 1974, later phase being completed in 1987. The design is based on large open plan floor plates with a central core for books and perimeter study spaces. The building’s construction c...