HWU1700 Library Interim Upgrade Main Contractor
The first phase of the Cameron Smail Library was built in 1974, later phase being completed in 1987. The design is based on large open plan floor plates with a central core for books and perimeter study spaces. The building’s construction comprises generally of an in-situ reinforced concrete frame supported on pad foundations. The building is clad in non-loadbearing brickwork with large single-glazed panels to the west, north and east façades and more limited glazing to the southern aspect. The project involves ref...
Buyer
Heriot Watt University
Value
£4,000,000
Published
18 Jan 2017
Closes
17 Feb 2017
Procurement details
Source
Pcs
Region
United Kingdom
Procurement method
Selective
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45210000
Building construction work
45214000
Construction work for buildings relating to education and research
45214400
Construction work for university buildings
Lots
Lot 1 HWU1700 Library Interim Upgrade Main Contractor
£4,000,000
The first phase of the Cameron Smail Library was built in 1974, later phase being completed in 1987. The design is based on large open plan floor plates with a central core for books and perimeter study spaces. The building’s construction comprises generally of an in-situ reinforced concrete frame supported on pad foundations. The building is clad in non-loa...
Delivery: Edinburgh, City of
Documents
Unlock document linkHWU1700 Library Interim Upgrade Main Contractor
Not provided
The first phase of the Cameron Smail Library was built in 1974, later phase being completed in 1987. The design is based on large open plan floor plates with a central core for books and perimeter study spaces. The building’s construction c...
Contract notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.