Stornoway Port Authority, Goat Island Project
The Port Authority wishes to develop a new food processing factory and refurbish the boat yard on Goat Island. The project is split into two lots. Lot 1 is to provide a new factory, which is to be completed to a shell standard including services. The Port Authority wishes to appoint an Architect-Led Design Team Consultancy. Lot 2 is to improve the current facilities of the Boat Yard. The Port Authority wishes a Civil/Structural Engineer-Led design team to provide full design consultancy and cost management services...
Buyer
Stornoway Port Authority
Value
Not provided
Published
2 Dec 2016
Closes
17 Jan 2017
Procurement details
Source
Pcs
Region
United Kingdom
Procurement method
Open
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
79415200
Design consultancy services
71322000
Engineering design services for the construction of civil engineering works
71321000
Engineering design services for mechanical and electrical installations for buildings
71200000
Architectural and related services
71320000
Engineering design services
Lots
Lot 1 Architect-Led Design Team Consultancy Services for Lot 1 Food Processing Facility - Goat Island, Stornoway
Value not provided
The Port Authority wishes to develop a new food processing factory on Goat Island. The project is to provide a new factory plan shape to be rationalised, with offices, canteen and staff facilities on an upper floor, with the likely result that approximately one quarter of the building will be on two levels. The factory is to be completed to a shell standard...
Delivery: Eilean Siar (Western Isles)
Lot 2 Civil / Structural / Marine Engineer-Led Design Team Consultancy Services for Lot 2 Boat Yard Development - Goat Island, Stornoway
Value not provided
The Port Authority is progressing a project to improve the current facilities of the Boat Yard on Goat Island. The project is to extend the existing side slip and install a new boat marine building. This will allow the Boat Yard to undertake works under cover during the winter period. The Port Authority is seeking a Civil / Structural / Engineer-Led design t...
Delivery: Eilean Siar (Western Isles)
Documents
Unlock document linkStornoway Port Authority, Goat Island Project
Not provided
The Port Authority wishes to develop a new food processing factory and refurbish the boat yard on Goat Island. The project is split into two lots. Lot 1 is to provide a new factory, which is to be completed to a shell standard including ser...
Contract notice · Web page
ITT for Lot 1 Food Processing Facility
5 Dec 2016
Word document
ITT for Lot 2 Boat Yard
5 Dec 2016
Word document
Lot 1 Alternative ESPD 4C.1.2
5 Dec 2016
Word document
Lot 2 Alternative ESPD 4C.1.2
5 Dec 2016
Word document
Lot 1 Food Processing Facility
5 Dec 2016
Lot 2 Boat Yard
5 Dec 2016
Lot 1 Outline of Project
5 Dec 2016
Word document
Lot 2 Outline of Project
5 Dec 2016
Word document
Lot 1 End of Stage report contents
5 Dec 2016
Word document
Lot 2 End of Stage report contents
5 Dec 2016
Word document
Lot 1 Draft programme
5 Dec 2016
Contains public sector information licensed under the Open Government Licence v3.0.