Provision and Fitting of Combined Cold Cutting and Ultra High Pressure Fire Fighting Equipment
SFRS has a requirement for the provision and fitting of Combined Cold Cutting and Ultra High Pressure Fire Fighting Equipment to their appliances. There will be an initial requirement for a number of the equipment to be provided and fitted in order to allow SFRS to conduct a 6 month pilot evaluation of the equipment in an operational environment. Dependant on the outcome of this pilot, SFRS may purchase further units to be deployed within each Service Delivery Area.
Buyer
Scottish Fire and Rescue Service
Value
Not provided
Published
1 Aug 2016
Closes
31 Aug 2016
Procurement details
Source
Pcs
Region
United Kingdom
Procurement method
Open
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
35111000
Firefighting equipment
35111510
Fire suppression hand tools
35111500
Fire suppression system
Lots
Lot 3 FIRE SUPPRESSION TOOL
Value not provided
The equipment required under this lot is specifically to equip fire fighting crews to attack fires and improve fire conditions prior to entry into a compartment. It will reduce risk to fire fighters, reduce fire damage and increase the ability of the fire fighter to make interventions at compartmental fires. Economic operators may be excluded from this compe...
Delivery: Scotland
Lot 2 ULTRA HIGH PRESSURE SYSTEM FITTED TO LGV
Value not provided
The system shall support firefighting operations from outside the fire compartment The system shall provide a piercing/cutting capability through all conventional construction materials: brick/stone/breeze block/construction block/sheet metal/ concrete (including reinforced)/sandwich panels/timber The lance/branch must be constructed in such a manner as to b...
Delivery: Scotland
Lot 1 ULTRA HIGH PRESSURE SYSTEM FITTED TO FRONT LINE APPLIANCE
Value not provided
The system shall support firefighting operations from outside the fire compartment The system shall provide a piercing/cutting capability through all conventional construction materials: brick/stone/breeze block/construction block/sheet metal/ concrete (including reinforced)/sandwich panels/timber The lance/branch must be constructed in such a manner as to b...
Delivery: Scotland
Documents
Unlock document linkProvision and Fitting of Combined Cold Cutting and Ultra High Pressure Fire Fighting Equipment
Not provided
SFRS has a requirement for the provision and fitting of Combined Cold Cutting and Ultra High Pressure Fire Fighting Equipment to their appliances. There will be an initial requirement for a number of the equipment to be provided and fitted...
Contract notice · Web page
Invitation to Tender for Cold cutting and Fire Suppression Equipment
3 Aug 2016
Word document
Appendix B Price Schedule
3 Aug 2016
Excel spreadsheet
Invitation to Tender for Cold cutting and Fire Suppression Equipment
8 Aug 2016
Word document
Appendix B - Price Schedule Amended
11 Aug 2016
Excel spreadsheet
Contains public sector information licensed under the Open Government Licence v3.0.