Open Tenderocds-r6ebe6-0000454926

Provision and Fitting of Combined Cold Cutting and Ultra High Pressure Fire Fighting Equipment

SFRS has a requirement for the provision and fitting of Combined Cold Cutting and Ultra High Pressure Fire Fighting Equipment to their appliances. There will be an initial requirement for a number of the equipment to be provided and fitted in order to allow SFRS to conduct a 6 month pilot evaluation of the equipment in an operational environment. Dependant on the outcome of this pilot, SFRS may purchase further units to be deployed within each Service Delivery Area.

Buyer

Scottish Fire and Rescue Service

Value

Not provided

Published

1 Aug 2016

Closes

31 Aug 2016

Procurement details

Source

Pcs

Region

United Kingdom

Procurement method

Open

Category

Goods

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

35111000

Firefighting equipment

35111510

Fire suppression hand tools

35111500

Fire suppression system

Lots

Lot 3 FIRE SUPPRESSION TOOL

Value not provided

The equipment required under this lot is specifically to equip fire fighting crews to attack fires and improve fire conditions prior to entry into a compartment. It will reduce risk to fire fighters, reduce fire damage and increase the ability of the fire fighter to make interventions at compartmental fires. Economic operators may be excluded from this compe...

Delivery: Scotland

Lot 2 ULTRA HIGH PRESSURE SYSTEM FITTED TO LGV

Value not provided

The system shall support firefighting operations from outside the fire compartment The system shall provide a piercing/cutting capability through all conventional construction materials: brick/stone/breeze block/construction block/sheet metal/ concrete (including reinforced)/sandwich panels/timber The lance/branch must be constructed in such a manner as to b...

Delivery: Scotland

Lot 1 ULTRA HIGH PRESSURE SYSTEM FITTED TO FRONT LINE APPLIANCE

Value not provided

The system shall support firefighting operations from outside the fire compartment The system shall provide a piercing/cutting capability through all conventional construction materials: brick/stone/breeze block/construction block/sheet metal/ concrete (including reinforced)/sandwich panels/timber The lance/branch must be constructed in such a manner as to b...

Delivery: Scotland

Provision and Fitting of Combined Cold Cutting and Ultra High Pressure Fire Fighting Equipment

Not provided

SFRS has a requirement for the provision and fitting of Combined Cold Cutting and Ultra High Pressure Fire Fighting Equipment to their appliances. There will be an initial requirement for a number of the equipment to be provided and fitted...

Contract notice · Web page

Invitation to Tender for Cold cutting and Fire Suppression Equipment

3 Aug 2016

Word document

Appendix B Price Schedule

3 Aug 2016

Excel spreadsheet

Invitation to Tender for Cold cutting and Fire Suppression Equipment

8 Aug 2016

Word document

Appendix B - Price Schedule Amended

11 Aug 2016

Excel spreadsheet

Contains public sector information licensed under the Open Government Licence v3.0.