Redevelopment of Newport City Campus - Phase 3
Phase 3 of the Newport Redevelopment Project is split into 3 Floors.A floor is the hub of the campus and at present infrequently utilised and lacks a sense of vibrancy and purpose. The space is presently occupied by a catering outlet, security desk, and business exchange plus a vast unutilised space. This project will give opportunity to extend the catering facility, remove the business hub and create more vibrant spaces. We presently have 4 lecture theatres on A floor and 2 are surplus to requirement and are to be...
Buyer
University of South Wales
Value
Not provided
Published
22 Mar 2024
Closes
26 Apr 2024
Procurement details
Source
Sell2Wales
Region
Central Valleys
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
No CPV codes are available for this public record.
Lots
Lot default Redevelopment of Newport City Campus - Phase 3
Value not provided
Phase 3 of the Newport Redevelopment Project is split into 3 Floors.A floor is the hub of the campus and at present infrequently utilised and lacks a sense of vibrancy and purpose. The space is presently occupied by a catering outlet, security desk, and business exchange plus a vast unutilised space. This project will give opportunity to extend the catering...
Documents
Unlock document linkA. Invitation to Tender
22 Mar 2024
Word document
A.1 Social Value Template
22 Mar 2024
Excel spreadsheet
A.2 Well Being of Future Generations Guide
22 Mar 2024
A.3 Tender Return Form
22 Mar 2024
Word document
B. Drawings (ABM)
22 Mar 2024
ZIP archive
B. Drawings (Austin Smith Lord)
22 Mar 2024
ZIP archive
B. Drawings (Hydrock)
22 Mar 2024
ZIP archive
B. Drawings (USW)
22 Mar 2024
ZIP archive
C. Specifications (ABM)
22 Mar 2024
C. Specifications (Austin Smith Lord)
22 Mar 2024
C. Specifications (Hydrock)
22 Mar 2024
D. Schedule of Rates
22 Mar 2024
Excel spreadsheet
Contains public sector information licensed under the Open Government Licence v3.0.