Design, Operate and Maintain a Solar Farm with Private Wire Connection at Coed Ely
Design, Operate and Maintain a Solar Farm and Private Wire Scheme at Coed Ely.
Buyer
RHONDDA CYNON TAF COUNCIL
Value
£8,611,910
Published
1 Aug 2024
Closes
8 Apr 2024
Procurement details
Source
Sell2Wales
Region
Central Valleys
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45314300
Installation of cable infrastructure
09332000
Solar installation
09331000
Solar panels
09331200
Solar photovoltaic modules
31321300
High-voltage cable
45314310
Installation of cable laying
45315400
High voltage installation work
Lots
Lot 1 Design, Operate and Maintain a Solar Farm with Private Wire Connection at Coed Ely
£8,611,910
Rhondda Cynon Taf County Borough Council (“RCT”) are seeking to award a contract for a Solar Energy Farm for Design, Build, Operate and Maintain a Solar Farm and Private Wire Scheme (“The Project”), under an DBOM Contract. The estimated total ground mounted solar capacity is approximately 6 MW. The solar farm will be designed as two separate installations to...
Delivery: Central Valleys
Documents
Unlock document linkDesign, Operate and Maintain a Solar Farm with Private Wire Connection at Coed Ely
Not provided
Design, Operate and Maintain a Solar Farm and Private Wire Scheme at Coed Ely.
Contract notice · Web page
Design, Operate and Maintain a Solar Farm with Private Wire Connection at Coed Ely
Not provided
Design, Operate and Maintain a Solar Farm and Private Wire Scheme at Coed Ely.
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.