Cardiff Distillery Canning Line Pipework
Cardiff Distillery are seeking quotes for the following pipework which will allow a canning line to be fully functional.Pipework requirementsWatermains feed around the distillery run in 28mm pipe 130 meter run with 10 tees with isolatorsCO2 pipework -supply, install, test (8 bar) and commission the following:28mm copper pipework running at high level from a liquid CO2 tank 120 meter run and install 7 of down drops in 15mm copper, with 7 CO2 regulator/outlet points.Steam Pipework in 2 inch insulated stainless steel...
Buyer
Cardiff Distillery
Value
Not provided
Published
22 Aug 2023
Closes
6 Sept 2023
Procurement details
Source
Sell2Wales
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
No CPV codes are available for this public record.
Lots
Lot default Cardiff Distillery Canning Line Pipework
Value not provided
Cardiff Distillery are seeking quotes for the following pipework which will allow a canning line to be fully functional.Pipework requirementsWatermains feed around the distillery run in 28mm pipe 130 meter run with 10 tees with isolatorsCO2 pipework -supply, install, test (8 bar) and commission the following:28mm copper pipework running at high level from a...
Documents
No document metadata is available for this public record.