Closed Tenderocds-kuma6s-134233

Cardiff Distillery Canning Line Pipework

Cardiff Distillery are seeking quotes for the following pipework which will allow a canning line to be fully functional.Pipework requirementsWatermains feed around the distillery run in 28mm pipe 130 meter run with 10 tees with isolatorsCO2 pipework -supply, install, test (8 bar) and commission the following:28mm copper pipework running at high level from a liquid CO2 tank 120 meter run and install 7 of down drops in 15mm copper, with 7 CO2 regulator/outlet points.Steam Pipework in 2 inch insulated stainless steel...

Buyer

Cardiff Distillery

Value

Not provided

Published

22 Aug 2023

Closes

6 Sept 2023

Procurement details

Source

Sell2Wales

Region

United Kingdom

Procurement method

Open

Category

Works

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

No CPV codes are available for this public record.

Lots

Lot default Cardiff Distillery Canning Line Pipework

Value not provided

Cardiff Distillery are seeking quotes for the following pipework which will allow a canning line to be fully functional.Pipework requirementsWatermains feed around the distillery run in 28mm pipe 130 meter run with 10 tees with isolatorsCO2 pipework -supply, install, test (8 bar) and commission the following:28mm copper pipework running at high level from a...

Documents

No document metadata is available for this public record.

Contains public sector information licensed under the Open Government Licence v3.0.