Ucheldre Phase 2: Stage 5 Two Stage Main Construction Contract
Ucheldre has completed RIBA Stage 4.1 for a newbuild extension and refurbishment to the existing Listed Building which is used as an arts centre. Ucheldre needs to keep functioning during the construction period and there is a tight deadline to complete the whole project by March 2025, hence the splitting of the construction into 2 Phases. Phase 1 is to get ahead with the Repairs and Renewal of the existing building to be followed by Phases 2a (Enabling), 2b (Main Works), and 2c (Reunification), which will involve...
Buyer
Canolfan Ucheldre Centre
Value
Not provided
Published
30 Oct 2023
Closes
15 Sept 2023
Procurement details
Source
Sell2Wales
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
No CPV codes are available for this public record.
Lots
Lot default Ucheldre Phase 2: Stage 5 Two Stage Main Construction Contract
Value not provided
Ucheldre has completed RIBA Stage 4.1 for a newbuild extension and refurbishment to the existing Listed Building which is used as an arts centre. Ucheldre needs to keep functioning during the construction period and there is a tight deadline to complete the whole project by March 2025, hence the splitting of the construction into 2 Phases. Phase 1 is to get...
Documents
Unlock document linkInvitation to Tender
21 Aug 2023
02 - NRM2 Preliminaries Pricing Schedule
21 Aug 2023
Excel spreadsheet
01 Section 1 - Project Preliminaries
21 Aug 2023
Form of Tender
21 Aug 2023
Phasing Drawings re-sent having been sent previously. M
14 Sept 2023