Contract for the Supply And Installation Of A Pontoon Facility On The River Tawe at Hafod Copperwork
Construction of a new pontoon, of steel and concrete, alongside the listed stone river quay wall, consisting of: a steel bridgehead platform with GRP mesh decking fixed to the wall; 4no. connected glassfibre concrete deck pontoons which rise up and down 4no. steel vertical guide columns fixed back to the wall; and a hinged steel bridge with GRP mesh decking linking the two. Also included are guardrails and gates - on the edge of the quayside and the bridgehead platform of stainless steel; and around the pontoons of...
Buyer
City & County of Swansea
Value
Not provided
Published
19 Aug 2022
Closes
19 Sept 2022
Procurement details
Source
Sell2Wales
Region
Swansea
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
No CPV codes are available for this public record.
Lots
Lot default Contract for the Supply And Installation Of A Pontoon Facility On The River Tawe at Hafod Copperwork
Value not provided
Construction of a new pontoon, of steel and concrete, alongside the listed stone river quay wall, consisting of: a steel bridgehead platform with GRP mesh decking fixed to the wall; 4no. connected glassfibre concrete deck pontoons which rise up and down 4no. steel vertical guide columns fixed back to the wall; and a hinged steel bridge with GRP mesh decking...
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.