EDED1902.2 - Ysgol Feithrin Conwy, Early Years Facility
The Design and Construction of an Early Years Provision playgroup facility, approx. 116m2 to include 70m2 classroom, staff area, kitchen, store and toilets along with the inclusion of a canopy to the rear of the building and associated external works. RIBA Stages 0 and 1 have been completed and a basic concept layout has been provided in response to the requirements of 30hr Childcare Capital Grant provisions. No elevations have been produced.The contractors are required to provide a tender for the full design (full...
Buyer
Conwy County Borough Council
Value
Not provided
Published
29 Jun 2022
Closes
11 Aug 2022
Procurement details
Source
Sell2Wales
Region
Conwy and Denbighshire
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
No CPV codes are available for this public record.
Lots
Lot default EDED1902.2 - Ysgol Feithrin Conwy, Early Years Facility
Value not provided
The Design and Construction of an Early Years Provision playgroup facility, approx. 116m2 to include 70m2 classroom, staff area, kitchen, store and toilets along with the inclusion of a canopy to the rear of the building and associated external works. RIBA Stages 0 and 1 have been completed and a basic concept layout has been provided in response to the requ...
Documents
Unlock document linkYsgol Feithrin Conwy Tender Documents, Volumes 1 to 5 and Appendices
29 Jun 2022
ZIP archive
Ysgol Feithrin Conwy Tender Documents, Volumes 1 to 5 and Appendices
30 Jun 2022
ZIP archive
Volume 2 Word Document
30 Jun 2022
Word document
Parent Company Guarantee
30 Jun 2022
Word document
Sub contractor Collateral Warranty
30 Jun 2022
Word document
T034 Issue 2 Construction Phase Plan Checklist
30 Jun 2022
Word document
T039 Issue 1 Health and Safety File
30 Jun 2022
Word document
Contains public sector information licensed under the Open Government Licence v3.0.