CVL Transformation - Package 07 Stations - ITT
Soil testing required to be undertaken at Cwmcynon Footbridge site to aid the permanent works designer with existing ground conditions at site. Work area is within the railway corridor adjacent to track and next to a river. Testing requirements detailed below:Shear Vane Testing at 10 no. locations. At each location testing shall be carried out at 1mBGL, 1.75mBGL and 2.5mBGL in accordance with BS EN ISO 22476-9 and BS EN 1997-2SHDP (Type B) at 3no. locations to a minimum depth of 5mNOTE: To register your interest in...
Buyer
Alun Griffiths Contractors
Value
Not provided
Published
25 Apr 2022
Closes
4 May 2022
Procurement details
Source
Sell2Wales
Region
United Kingdom
Procurement method
Not provided
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
No CPV codes are available for this public record.
Lots
Lot default CVL Transformation - Package 07 Stations - ITT
Value not provided
Soil testing required to be undertaken at Cwmcynon Footbridge site to aid the permanent works designer with existing ground conditions at site. Work area is within the railway corridor adjacent to track and next to a river. Testing requirements detailed below:Shear Vane Testing at 10 no. locations. At each location testing shall be carried out at 1mBGL, 1.75...
Documents
Unlock document linkPiling Platform DWG
25 Apr 2022
Contains public sector information licensed under the Open Government Licence v3.0.