Key Stage 2 classroom modular build
The build of a new standalone modular Key Stage 2 classroom (or double classroom) at Witheridge C of E Academy with a covered walkway to link back to the main building. - Minimum teaching space of 55m2 (per classroom if double) - 2 Toilets provided, one of which to be disabled - Cloakroom area included in design - Storeroom provision included in design - Covered walkway to link back to the main building - Building works including ground clearance and ground preparation - Survey and design including planning permiss...
Buyer
TEAM MULTI-ACADEMY TRUST
Value
£187,000
Published
8 Jun 2026
Closes
29 Jun 2026
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45000000
Construction work
Lots
Lot 1 Key Stage 2 classroom modular build
£187,000
Delivery: UKK4 · United Kingdom
Documents
Unlock document linkThe tender will be conducted through the PHP Law tendering portal which can be accessed via this link.
Not provided
The tender will be conducted through the PHP Law tendering portal which can be accessed via this link.
Technical specifications
Site Plan - Area marked 5/6 outlined in blue is the site to be developed including the area for the covered walkway to link back to the main building. A site vi...
Not provided
Site Plan - Area marked 5/6 outlined in blue is the site to be developed including the area for the covered walkway to link back to the main building. A site visit is available on Thursday 18th June - please contact us via the tender portal...
Bidding documents · PDF
Tender notice on Find a Tender
8 Jun 2026
Tender notice on Find a Tender
Tender notice · UK4 · Web page
Contains public sector information licensed under the Open Government Licence v3.0.