Awarded Contractocds-h6vhtk-058dc9

Traction Power & Earthing Upgrades - Phase 1 Works

TfGM has established a contract to ascertain current asset condition information & outline design (Phase 1). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was “floated” in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non...

Buyer

Transport for Greater Manchester

Value

£527,457

Published

26 Aug 2025

Closes

26 Aug 2025

Procurement details

Source

Find a Tender

Region

Manchester

Procurement method

Open

Category

Works

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

45000000

Construction work

Lots

Lot 1 Traction Power & Earthing Upgrades - Phase 1 Works

£527,457

TfGM has established a contract to ascertain current asset condition information & outline design (Phase 1). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was “floated” in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be...

Delivery: United Kingdom

Documents

No document metadata is available for this public record.

Contains public sector information licensed under the Open Government Licence v3.0.