Active Fire Framework 2025
The scope of this Framework Agreement is for the provision of active fire products and services. The Framework will cover, but is not limited to: •Risk assessments; inspections; fire equipment testing; and portable appliances testing •Fire products including fire detectors; manual and automatic action products; and fire-retardant products •Servicing and maintenance; fire safety and remedial works; security and access systems; emergency lighting; fire damper and fire collar maintenance; and minor works and servicing...
Buyer
Tamworth Borough Council
Value
£510,910,000
Published
27 Jan 2026
Closes
15 Sept 2025
Procurement details
Source
Find a Tender
Region
Staffordshire CC
Procurement method
Open
Category
Services
Contract starts
15 Jan 2026
Contract ends
14 Jan 2030
CPV classifications
51700000
Installation services of fire protection equipment
71317100
Fire and explosion protection and control consultancy services
50413200
Repair and maintenance services of firefighting equipment
31518200
Emergency lighting equipment
31625100
Fire-detection systems
31625200
Fire-alarm systems
35000000
Security, fire-fighting, police and defence equipment
35100000
Emergency and security equipment
Lots
Lot 1.1 Sub-Lot 1.1 Fire Detection
£19,950,000
Design, installation, commissioning and maintenance of fire detection systems to ensure the safety and compliance of buildings and facilities. The goal is to provide early detection of fire incidents to protect life and property. Purpose The purpose of the fire detection system is to: •Detect fire incidents at the earliest possible stage. •Alert occupants an...
Delivery: UK · United Kingdom
Lot SUB-LOT 1.2 SUB-LOT 1.2: SMOKE CONTROL SYSTEMS
£49,850,000
Supply and installation of smoke control systems to ensure the safety and compliance of buildings and facilities. The goal is to provide effective smoke control to facilitate safe evacuation and fire suppression efforts. Purpose The purpose of this specification is to: •Supply high-quality manual and automatic smoke control products. •Ensure proper installat...
Delivery: UK · United Kingdom
Lot SUB-LOT 1.3 SUB-LOT 1.3: SPRINKLER SYSTEM
£49,850,000
The requirements for the design, supply, installation, testing, and commissioning of sprinkler systems to ensure fire protection for the specified premises. The purpose of this specification is to: •Supply high-quality sprinkler systems to suppress or extinguish fire to protect life and property •Ensure proper installation and functionality of these products...
Delivery: UK · United Kingdom
Lot SUB-LOT 1.4 SUB-LOT 1.4: MISTING SYSTEM
£39,900,000
Design, supply, installation, testing, and commissioning of misting systems to ensure fire protection for the specified premises. The purpose is to: •Supply high-quality misting systems to suppress or extinguish fire to protect life and property •Ensure proper installation and functionality of these products. •Comply with relevant fire safety regulations and...
Delivery: UK · United Kingdom
Lot SUB-LOT 1.5 SUB-LOT 1.5: FIRE EXTINGUISHERS
£9,975,000
The requirements for the supply of fire extinguishers to ensure adequate fire protection for the specified premises.
Delivery: UK · United Kingdom
Lot SUB-LOT 1.6 SUB-LOT 1.6: EMERGENCY LIGHTING (SUPPLY AND INSTALLATION)
£49,850,000
The requirements for the design, supply, installation, testing, and commissioning of emergency lighting systems to ensure safe evacuation during power outages or emergencies.
Delivery: UK · United Kingdom
Lot SUB-LOT 1.7 SUB-LOT 1.7 FIRE ALARM MONITORING
£9,975,000
The requirements for the supply, installation, testing, and commissioning of a fire alarm monitoring system to ensure continuous surveillance and prompt response to fire incidents.
Delivery: UK · United Kingdom
Lot SUB-LOT 1.8 SUB-LOT 1.8: FIRE ESCAPE PRODUCTS
£19,950,000
The supply, installation, testing, and commissioning of fire escape products to ensure safe evacuation during emergencies.
Delivery: UK · United Kingdom
Lot SUB-LOT 1.9 SUB-LOT 1.9: DEFIBRILLATOR
£19,950,000
The supply of defibrillators to ensure their proper operation and availability in case of cardiac emergencies.
Delivery: UK · United Kingdom
Lot Sub-Lot 2.1 Sub-Lot 2.1: Fire Risk Assessments
£7,182,500
The requirements for conducting Fire Risk Assessments (FRA) to ensure the safety and compliance of buildings and facilities. The goal is to identify potential fire hazards, evaluate risks, and implement measures to mitigate these risks. The requirements of an FRA are to ensure that it assists member organisations to meet their obligations under the Regulator...
Delivery: UK · United Kingdom
Lot SUB-LOT 2.2 SUB-LOT 2.2: FIRE RISK INSPECTIONS
£7,182,500
The requirements for conducting Fire Risk Inspections (FRI) to ensure the safety and compliance of buildings and facilities. The goal is to identify potential fire hazards, evaluate risks, and implement measures to mitigate these risks. The purpose of the FRI is to: •Physically inspect buildings to identify fire hazards and risks within the premises or to ev...
Delivery: UK · United Kingdom
Lot SUB-LOT 2.3 SUB-LOT 2.3: FIRE ENGINEERING
£7,182,500
The requirements for Active Fire Engineering (AFE) to ensure the safety and compliance of buildings and facilities. The goal is to design, implement, and maintain effective fire protection systems. Purpose The purpose of the AFE is to: •Provide advice and guidance on areas of complex fire safety •Design fire protection systems that prevent, detect, and respo...
Delivery: UK · United Kingdom
Lot SUB-LOT 3.1 SUB-LOT 3.1: FIRE SERVICING AND MAINTENANCE
£49,850,000
The requirements for the servicing and maintenance of fire protection systems to ensure their proper operation and compliance with safety standards.
Delivery: UK · United Kingdom
Lot SUB-LOT 3.2 SUB-LOT 3.2: FIRE SAFETY, MINOR AND REMEDIAL WORKS
£59,825,000
The requirements for fire safety and remedial works to ensure compliance with fire safety regulations and enhance the overall safety of the premises
Delivery: UK · United Kingdom
Lot SUB-LOT 3.3 SUB-LOT 3.3: EMERGENCY LIGHTING
£34,912,500
The requirements for the maintenance of emergency lighting systems to ensure safe evacuation during power outages or emergencies.
Delivery: UK · United Kingdom
Lot SUB-LOT 3.4 SUB-LOT 3.4: FIRE DAMPER AND FIRE COLLAR MAINTENANCE
£5,700,000
The requirements for the maintenance of fire dampers and fire collars to ensure their proper operation and compliance with fire safety standards.
Delivery: UK · United Kingdom
Documents
Unlock document linkTender notice on Find a Tender
31 Jul 2025
Tender notice on Find a Tender
Tender notice · UK4 · Web page
Contract award notice on Find a Tender
16 Dec 2025
Contract award notice on Find a Tender
Award notice · UK6 · Web page
Untitled document
Not provided
Contract signed · PDF
Contract details notice on Find a Tender
27 Jan 2026
Contract details notice on Find a Tender
Contract notice · UK7 · Web page
Untitled document
Not provided
Contract signed · PDF
Untitled document
Not provided
Contract signed · PDF
Untitled document
Not provided
Contract signed · PDF
Untitled document
Not provided
Contract signed · PDF
Untitled document
Not provided
Contract signed · PDF
Untitled document
Not provided
Contract signed · PDF
Untitled document
Not provided
Contract signed · PDF
Untitled document
Not provided
Contract signed · PDF
Contains public sector information licensed under the Open Government Licence v3.0.