Track Systems
This procurement relates to track systems and HS2 Ltd has awarded the following contracts: 1) Delivery contract for Track - Urban (Lot 1 below) 2) Delivery contract for Track – Open Route Central (Lot 2 below) 3) Delivery contract for Track – Open Route North including Birmingham Spur (Lot 3 below) 4) Framework Agreement for Track delivery and other works (see Lot 4 below) Further information about the scope of works and the lots is set out in the remainder of this Contract Notice. Economic operators may have only...
Buyer
HIGH SPEED TWO (HS2) LIMITED
Value
Not provided
Published
13 Feb 2025
Closes
13 Feb 2025
Procurement details
Source
Find a Tender
Region
Camden and City of London
Procurement method
Selective
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45230000
Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
Lots
Lot 1 Track - Urban
Value not provided
The scope of the Lot 1 works includes the installation of all track infrastructure within the Urban geographical area, which includes stations, open route, bored tunnels and cut and- cover tunnels. The track infrastructure incorporates the design and construction of: - resilient and standard cast in-situ slab track; - standard pre-cast slab track (a separate...
Delivery: United Kingdom
Lot 2 Track - Central
Value not provided
The scope of the Lot 2 works includes the installation of all track infrastructure within the Central geographical area, including through open route, viaducts and cut-and-cover tunnels. The track infrastructure incorporates the design and construction of: - standard pre-cast slab track (a separate supply arrangement); - mainline Switches & Crossings (S&C) u...
Delivery: United Kingdom
Lot 3 Track - North
Value not provided
The scope of the Lot 3 works includes the installation of all track infrastructure within the North geographical area, including through open route, viaducts and cut-and-cover tunnels. The track infrastructure incorporates the design and construction of: - standard pre-cast slab track (a separate supply arrangement); - High-Speed ballasted track (design and...
Delivery: United Kingdom
Lot 4 Track Systems Framework Agreement
Value not provided
HS2 Ltd has established a multi-supplier framework agreement (FA) alongside the delivery contracts for lots 1, 2 and 3. The scope of work covered by the FA will be: — the works covered by lots 1, 2 and 3 (or the residual elements of those works) in the event of the termination or other failure of those contracts due to contractor default — other parts of the...
Delivery: United Kingdom
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.