Birnbeck Pier Reinstatement works
Works to restore the Birnbeck Pier Structure connecting the mainland to the Birnbeck Island. This structure is Listed Grade II*. In summary, the works within scope are: • The removal, renovation and replacement of Birnbeck Pier bridge. • Dismantling and re-erection of the two bridge abutments. • Reinstatement of 14 No. Semi-circular cantilevered bays. • Bench seating running longitudinally along pier length (option dependant on budget). • Appropriate lighting (option dependant on budget).
Buyer
North Somerset Council
Value
£18,000,000
Published
4 Dec 2025
Closes
25 Apr 2025
Procurement details
Source
Find a Tender
Region
Bath and North East Somerset, North Somerset and South Gloucestershire
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45000000
Construction work
Lots
Lot 1 Birnbeck Pier Reinstatement works
£18,000,000
Works to restore the Birnbeck Pier Structure connecting the mainland to the Birnbeck Island. This structure is Listed Grade II*. In summary, the works within scope are: • The removal, renovation and replacement of Birnbeck Pier bridge. • Dismantling and re-erection of the two bridge abutments. • Reinstatement of 14 No. Semi-circular cantilevered bays. • Benc...
Delivery: Bath and North East Somerset, North Somerset and South Gloucestershire
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.