Main Rehab Framework Agreement
Thames Water has planned for 570km to be delivered during AMP8 (with a further 1,000km in AMP9). The intention is to split this between water quality driven mains rehab (12km), burst driven mains rehab (108km) and whole DMA replacement (380km). This framework is intended to compliment the existing framework by providing supplementary support in addressing the evolving demands of the current framework in the next AMP and going forward. The aim of the AMP8 Distribution Mains Renewal Programme is to replace the pipewo...
Buyer
THAMES WATER UTILITIES LIMITED
Value
£440,000,000
Published
12 Sept 2024
Closes
25 Sept 2024
Procurement details
Source
Find a Tender
Region
Berkshire
Procurement method
Not provided
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45000000
Construction work
Lots
Lot 1 Design and Build
Value not provided
This Mains Rehab Framework procurement is for the appointment of a Contractor(s) to deliver the mains works under a design and build (Lot 1) and build only (Lot 2) contracts. The value of the works is estimated between £300m to £440m covering an estimated meterage 100-200km across the Thames Valley, North London and South London (including Guildford) regions...
Delivery: London
Lot 2 Build Only
Value not provided
This Mains Rehab Framework procurement is for the appointment of a Contractor(s) to deliver the mains works under a design and build (Lot 1) and build only (Lot 2) contracts. The value of the works is estimated between £300m to £440m covering an estimated meterage 100-200km across the Thames Valley, North London and South London(including Guildford) regions...
Delivery: London
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.