UER Foxtrot 10 End – Runway
UER Foxtrot 10 End – Runway Resurfacing
Buyer
Ministry of Defence
Value
£20,000,000
Published
8 Aug 2024
Closes
8 Aug 2024
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Limited
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45235210
Runway resurfacing
Lots
Lot 1 UER Foxtrot 10 End – Runway
£20,000,000
4. Foxtrot Taxiway and 10-Threshold were part of the original airfield construction from 1985; 400mm PQC (pavement quality concrete) on 150mm rolled drylean concrete. In 2011, as part of Project Shackleton, it was treated with a sanded epoxide resin surface treatment (Addagrip). As with all the other areas of original concrete, these areas are suffering from...
Delivery: FK
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.