Tritium Plant Virtual Control Room
UKAEA is currently designing a new tritium processing plant, referred to as the Hydrogen-3 Advanced Technology (H3AT) Facility. The H3AT Facility will be located on the UKAEA Culham site in the existing H3AT building. A virtual control room for the H3AT facility is required to train operators, engineers and users on the operation of the facility, by providing the capability to simulate the behaviour of the tritium processing plant. It is envisaged that this will be similar to the operator training simulators used e...
Buyer
United Kingdom Atomic Energy Authority (UKAEA)
Value
Not provided
Published
1 Aug 2024
Closes
1 Aug 2024
Procurement details
Source
Find a Tender
Region
Berkshire, Buckinghamshire and Oxfordshire
Procurement method
Not provided
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
48151000
Computer control system
30200000
Computer equipment and supplies
48100000
Industry specific software package
48150000
Industrial control software package
51900000
Installation services of guidance and control systems
Lots
Lot 1 Tritium Plant Virtual Control Room
Value not provided
UKAEA is currently designing a new tritium processing plant, referred to as the Hydrogen-3 Advanced Technology (H3AT) Facility. The H3AT Facility will be located on the UKAEA Culham site in the existing H3AT building. A virtual control room for the H3AT facility is required to train operators, engineers and users on the operation of the facility, by providin...
Delivery: Oxfordshire
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.