HPSW Regeneration 14/15 Dock; Survey, Design and Delivery
This project relates to the High Pressure Salt Water (HPSW) fire suppression system at 14 and 15 dock. A new HPSW system is required for vessels in wet dock and dry dock for fire suppression while maintenance work is ongoing. The initial phase of this project is survey & design, the contract may extend to build however this will be determined once the solution is established. Please note the information in this notice relates to whole project if build is included. The aim of the initial phase is to survey and deter...
Buyer
KBS MARITIME LIMITED
Value
Not provided
Published
20 Aug 2024
Closes
22 Aug 2024
Procurement details
Source
Find a Tender
Region
South West (England)
Procurement method
Selective
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45248000
Construction work for hydro-mechanical structures
45244000
Marine construction works
Lots
Lot 1 HPSW Regeneration 14/15 Dock; Survey, Design and Delivery
Value not provided
This project relates to the High Pressure Salt Water (HPSW) fire suppression system at 14 and 15 dock. A new HPSW system is required for vessels in wet dock and dry dock for fire suppression while maintenance work is ongoing. The initial phase of this project is survey & design, the contract may extend to build however this will be determined once the soluti...
Delivery: Portsmouth