Awarded Contractocds-h6vhtk-04690c

Class 195 & Class 331 Sanding Equipment Modification

The class 195 & class 331 fleet have been found to have poorly functioning sanding & compressor performance. Initial review of Sand flow compared against industry recommended levels (1000grams within 30 seconds) shows that current performance is 397grams & 395grams within 30 seconds respectively. The works to be undertaken within this contract will see the performance of the sanding equipment aligned to industry standard via; 1. Improving Sanding Performance through modifications & re-baselining of the system 2. Re...

Buyer

NORTHERN TRAINS LIMITED

Value

Not provided

Published

20 May 2024

Closes

20 May 2024

Procurement details

Source

Find a Tender

Region

York

Procurement method

Limited

Category

Goods

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

34630000

Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment

Lots

Lot 1 Class 195 & Class 331 Sanding Equipment Modification

Value not provided

Northern Trains currently operate a fleet of 43 CAF built Class 331 EMU train sets (made up of 31 class 331/0 3-carriage trains and 12 class 331/1 4-carriage trains ) and 58 CAF built Class 195 DMU trainsets (made up of 25 class 195/0 2-carriage trains and 33 class 195/1 3-carraige trains) which is equivalent too; o 86 x Class 331 Leading Vehicles equipped w...

Delivery: United Kingdom

Documents

No document metadata is available for this public record.

Contains public sector information licensed under the Open Government Licence v3.0.