Supply and Maintenance of Rolling Stock
LNER was seeking to procure a minimum fleet of ten (10) InterCity trains based around specific technical and operating characteristics. The trains were to be fully rated for operation on 25kV Overhead Line Equipment (OLE) and with self-power capability for operation away from the OLE. On Board Energy Storage (OBES) for traction was to be specified as a mandatory requirement to reduce, and wherever practicable eliminate, diesel usage where it would otherwise be necessary. LNER anticipated that some degree of diesel...
Buyer
LONDON NORTH EASTERN RAILWAY LIMITED
Value
Not provided
Published
6 Dec 2023
Closes
6 Dec 2023
Procurement details
Source
Find a Tender
Region
York
Procurement method
Selective
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
34620000
Rolling stock
Lots
Lot 1 Supply and Maintenance of Rolling Stock
Value not provided
LNER carried out a procurement process with potential manufacturers for the design, manufacture, testing and supply (and associated maintenance activities) of a base order of ten (10) InterCity trains, owner owned spares, special tools, simulator hardware and technical information, mock-ups and depot works for the use on the East Coast franchise. There was a...
Delivery: United Kingdom
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.