Traction Power & Earthing Upgrades - Phase 1 Works
TfGM is looking to establish a contract to ascertain current asset condition information & outline design (Phase 1). The current traction return system in the City Centre is already a floating system following the opening of 2nd City Crossing (2CC) in 2017. When the negative return system is floating, protective measures must be in place to protect persons against the risk of electric shock from dangerous voltages (touch or accessible voltages) between the rails and metallic objects or earth within the Overhead Con...
Buyer
Transport for Greater Manchester
Value
Not provided
Published
8 Oct 2024
Closes
3 Dec 2024
Procurement details
Source
Find a Tender
Region
Manchester
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45100000
Site preparation work
09000000
Petroleum products, fuel, electricity and other sources of energy
31000000
Electrical machinery, apparatus, equipment and consumables; lighting
34000000
Transport equipment and auxiliary products to transportation
45000000
Construction work
71000000
Architectural, construction, engineering and inspection services
Lots
Lot 1 Traction Power & Earthing Upgrades - Phase 1 Works
Value not provided
TfGM is looking to establish a contract to ascertain current asset condition information & outline design (Phase 1). The current traction return system in the City Centre is already a floating system following the opening of 2nd City Crossing (2CC) in 2017. When the negative return system is floating, protective measures must be in place to protect persons a...
Delivery: North West (England)
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.