Provision of High Level Scaffolding at Beauly Priory
As part of the High-Level Repointing and Wallhead Consolidation Project, Historic Environment Scotland has a requirement for high level scaffolding at Beauly Priory, Beauly, IV4 7DU. Scaffolding is required around gables and wallhead, internal and external as per design drawings to allow for masonry consolidation works on wallheads and should be Cuplock scaffolding to suit the design plans.
Buyer
Historic Environment Scotland
Value
£144,780
Published
26 Jan 2024
Closes
21 Dec 2023
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Open
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
50000000
Repair and maintenance services
Lots
Lot 1 Provision of High Level Scaffolding at Beauly Priory
£144,780
The Priory is a traditionally built solid masonry wall. The works are to be carried out on building gables and along length of wallheads between gables. Ground conditions internally are a stone flagged floor with horizontal memorials stones. Conditions are stable but provision should be made to protect all stone surfaces. Externally the ground is grass turf....
Delivery: Inverness & Nairn and Moray, Badenoch & Strathspey
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.