Repository Development (RD) Southern Trench Cap Interim Membrane Replacement (STIM)
LLW Repository Ltd trading as Nuclear Waste Services has a scope of work for the “Southern Trenches Interim Membrane (STIM) Contract”, which forms part of the Repository Development portfolio of work at the LLW Repository facility near Drigg Village in Cumbria, England.<br/><br/>The work consists of civil engineering works associated with installing an engineered interim trench cap over the Southern Trenches. In summary, the scope is to provide labour, equipment, materials, project management and supervision to com...
Buyer
LLW Repository Ltd trading as Nuclear Waste Services
Value
£53,000,000
Published
22 Aug 2023
Closes
22 Aug 2023
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Not provided
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45000000
Construction work
45222000
Construction work for engineering works except bridges, tunnels, shafts and subways
71000000
Architectural, construction, engineering and inspection services
45112500
Earthmoving work
44900000
Stone for construction, limestone, gypsum and slate
45112000
Excavating and earthmoving work
45500000
Hire of construction and civil engineering machinery and equipment with operator
45112310
Infill work
Lots
Lot 1 Repository Development (RD) Southern Trench Cap Interim Membrane Replacement (STIM)
Value not provided
Repository Development is a long-term portfolio of works that will provide disposal capacity and protection of low-level nuclear waste over the next 107 years, or until the end life of the Repository Site. In the shorter term the portfolio, over the next 15 years will install closure engineering works for short and long-term environmental protection for wast...
Delivery: West Cumbria
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.