Highway Works Multiple Lots Framework - HDG/2023/461
The City Council’s Highways Operations Division is responsible for maintenance of the adopted highway network in Stoke-on-Trent. The creation of this framework will provide increased capacity to enable the team to meet in-coming demand. During any periods where demand is greater than capacity, additional resources will be drawn down through the framework. This framework will be divided into Lots and will cover the following activities: • Carriageway patching and pot-hole works • Small to medium scale resurfacing wo...
Buyer
STOKE-ON-TRENT CITY COUNCIL
Value
£300,000
Published
30 Jan 2024
Closes
21 Sept 2023
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45233000
Construction, foundation and surface works for highways, roads
45200000
Works for complete or part construction and civil engineering work
44113000
Road-construction materials
34922100
Road markings
71320000
Engineering design services
45233130
Construction work for highways
45221100
Construction work for bridges
45233142
Road-repair works
Lots
Lot 1 - Minor Road Works Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
This lot is for hire of labour, materials and plant resources to undertake minor repairs on the highway network, such as pothole repairs and patches. The work to be executed under this framework will be spread over a number of sites within the City.
Delivery: Stoke-on-Trent
Lot 2A - Civil Engineering (tasl orers up to £500K) Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Work schemes will be inclusive of but not limited to: • Vehicle access crossings for both domestic and commercial premises • Footway reconstruction works • Carriageway reconstruction works • Carriageway overlays and inlays • Drainage installation works • Ducting installation works • Kerbing works either new lines or maintenance of existing ones • Small pavin...
Delivery: Stoke-on-Trent
Lot 2B - Civil Engineering (task order over £500K) Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Work schemes will be inclusive of but not limited to: • Vehicle access crossings for both domestic and commercial premises • Footway reconstruction works • Carriageway reconstruction works • Carriageway overlays and inlays • Drainage installation works • Ducting installation works • Kerbing works either new lines or maintenance of existing ones • Small pavin...
Delivery: Stoke-on-Trent
Lot Lot 3 - Specialist Paving Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
The installation of new ridged paving using propriety bedding mortar and grout and the maintenance of existing paved areas including cleaning repairing and re grouting and re sealing.
Delivery: Stoke-on-Trent
Lot 4 - Road Markings Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Works may comprise of any or all of the following activities: • Refreshing existing road markings: to follow the TRO to replace the existing road markings that are beyond their useful life • Renewing road markings: following drawings to implement new lining schemes following a completed scheme • Removal of existing markings: to remove any unwanted road marki...
Delivery: Stoke-on-Trent
Lot Lot 5 - Section 278 Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Work schemes will be inclusive of but not limited to: • Vehicle access crossings for both domestic and commercial premises • New design and Footway construction works • New design and Carriageway construction works • New design and Drainage installation works • Ducting installation works • Kerbing works either new lines or maintenance of existing ones • Pavi...
Delivery: Stoke-on-Trent
Lot Lot 6 - Vehicle Access Crossing Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Vehicle access for domestic and industrial footway crossings .
Delivery: Stoke-on-Trent
Lot Lot 7 - Bridges Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Works included within this lot will be: • Structural works (including bridges and occasional building works); • Bridge strengthening works; • Graffiti treatment; • Maintenance painting of steelwork; • Waterproofing and joint replacement works; • Road restraint systems; • Testing of materials; • Site investigations; • Bridge condition surveys; and • Bridge Ma...
Delivery: Stoke-on-Trent
Lot 1 Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Minor Works
Delivery: Stoke-on-Trent
Lot 2A Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Civil Engineering Schemes up to £500K
Delivery: Stoke-on-Trent
Lot 2B Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Civil Engineering schemes over £500K
Delivery: Stoke-on-Trent
Lot 3 Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Specialist Paving
Delivery: Stoke-on-Trent
Lot 4 Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Road Markings
Delivery: Stoke-on-Trent
Lot 5 Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Section 278
Delivery: Stoke-on-Trent
Lot 6 Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Vehicle Access Crossings
Delivery: Stoke-on-Trent
Lot 7 Highway Works Multiple Lots Framework - HDG/2023/461
Value not provided
Bridge repair
Delivery: Stoke-on-Trent
Documents
No document metadata is available for this public record.