Pressure Control Replacement
NGN use pressure profiling as a fundamental means to deliver on our reduced average system pressure targets. This allows us to minimise our CO footprint by reducing the quantity of background leakage in our aging pipeline ahead of replacement. The current Equipment used is aging and uses old communication technology, it also requires much of the equipment to be fitted outside the governor building which in some areas leads to vandalism and theft. The purpose of this contract is to provide the replacement of 100 uni...
Buyer
NORTHERN GAS NETWORKS LIMITED
Value
Not provided
Published
4 May 2023
Closes
4 May 2023
Procurement details
Source
Find a Tender
Region
Leeds
Procurement method
Limited
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
31730000
Electrotechnical equipment
Lots
Lot 1 Pressure Control Replacement
Value not provided
NGN use pressure profiling as a fundamental means to deliver on our reduced average system pressure targets. This allows us to minimise our CO footprint by reducing the quantity of background leakage in our aging pipeline ahead of replacement. The current Equipment used is aging and uses old communication technology, it also requires much of the equipment to...
Delivery: North East (England), North West (England), Yorkshire And The Humber
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.