Fire Safety Framework
This framework covers the geographical area of England and has been procured on behalf of: - Scottisch Procurement Alliance (SPA) This new framework replaces our previous Fire Safety framework and extends the scope to include waking watch services, active fire protection, fire suppression and cladding remediation. The framework consists of 8 (eight) workstreams and some workstreams have multiple lots. As follows: - Lot 1a - Fire Safety Consultancy - Lot 2a - Fire Risk Assessments and Fire Safety Inspections - Lot 3...
Buyer
LHC Procurement Group for the Scottish Procurement Alliance (SPA)
Value
£20,000,000
Published
5 Apr 2024
Closes
10 Aug 2023
Procurement details
Source
Find a Tender
Region
Scotland
Procurement method
Open
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
75251110
Fire-prevention services
71315200
Building consultancy services
71315100
Building-fabric consultancy services
71317100
Fire and explosion protection and control consultancy services
71317210
Health and safety consultancy services
79417000
Safety consultancy services
71313410
Risk or hazard assessment for construction
44221220
Fire doors
Lots
Lot 1 Fire Consultancy
£2,300,000
This consultancy lot delivers knowledge and advice on all aspects of fire safety including, fire safety legislation, active, passive and suppression systems to ensure safety and guide LHC clients with the formulation and reviewing fire risk assessments. The scope of this consultancy lot includes (but is not limited to): Fire Consultancy Advice on all fire sa...
Delivery: Scotland
Lot 2 Fire Risk Assessments
£2,300,000
The purpose of this Fire Risk Assessment lot is to advise LHC clients on identifying fire hazards, identifying individuals at risk, providing a method to evaluate, remove or deduce the risks of fire, recording the findings and providing appropriate actions. The scope of this lot will cover: Fire Risk assessments Block assessments
Delivery: Scotland
Lot 3 Waking Watch
£2,300,000
The waking watch service consists of suitably trained individuals who will continually patrol the interior and exterior areas of a building in order to ensure early detection of a fire and where necessary raise the alarm and ensure safe evacuation of the building. The core responsibilities of the individuals will be to: - Detect a fire in or within the bound...
Delivery: Scotland
Lot 4 Installation of Passive Fire Protection
£2,300,000
The Passive Fire Protection workstream is constructed to cover the specific items of fire protection that are typically installed in a building to protect the structural integrity of the building, limit the spread of fire and limit/control smoke spread. The scope of this lot includes the design, supply and installation of a range of passive fire protection m...
Delivery: Scotland
Lot 5 Installation of Active Fire Protection
£2,300,000
This workstream covers the design, installation and commissioning of a range of active fire protection measures as necessary to achieve fire safety compliance and current and future applicable fire safety legislation, (currently the Fire Safety Order 2005) and their associated British Standards. - Fire Alarm Systems - Emergency lighting design, supply, insta...
Delivery: Scotland
Lot 6 Active Fire Protection Testing, Servicing and Maintenance
£2,300,000
This lot covers the servicing, repair and maintenance of a range of active fire protection measures as necessary to ensure the Client's active fire safety systems are maintained in effective working order and free of fault and to ensure compliance with applicable fire safety legislation and standards. - Fire Alarm Systems servicing & maintenance - Emergency...
Delivery: Scotland
Lot 7 Installation of Fire Suppression Systems
£2,300,000
This workstream covers the design, installation and commissioning of a range of fire suppression measures typically installed in a building to limit the spread of fire and to limit / control smoke spread, to achieve fire safety compliance and current and future applicable fire safety legislation, (currently the Fire Safety Order 2005) and their associated Br...
Delivery: Scotland
Lot 8 Fire Suppression System Testing, Servicing and Maintenance
£2,300,000
This workstream covers the testing, servicing and maintenance of a range of fire suppression measures typically installed in a building to limit the spread of fire and to limit / control smoke spread, to achieve fire safety compliance and current and future applicable fire safety legislation, (currently the Fire Safety Order 2005) and their associated Britis...
Delivery: Scotland
Lot 9 Cladding Remediation
£2,300,000
The purpose of this cladding remediation lot is to provide LHC clients with a route to confirm the requirement to conduct remedial works to the external wall system (EWS) of a residential building, and subsequently carry out replacement or remediation of existing external cladding systems.
Delivery: Scotland
Lot 11 Multi-Disciplinary - Testing, Servicing and Maintenance of Passive, Active and Fire Suppression Measures
£2,300,000
The purpose of this multi-disciplinary lot is to provide LHC clients with a route to approved contractors who can cover multiple services that cover the service, maintenance and reactive support of passive, active or suppression fire measures either via direct labour or via sub-contractor where they will act as principal contractors.
Delivery: Scotland
Lot 10 Multi-Disciplinary - Installation of Passive, Active and Fire Suppression Measures
£2,300,000
The purpose of this multi-disciplinary lot is to provide LHC clients with a route to approved contractors who can cover multiple services that cover the installation of passive, active or suppression fire measures either via direct labour or via sub-contractor where they will act as principal contractors.
Delivery: Scotland
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.