Awarded Contractocds-h6vhtk-03a373

UKRI-2862 Installation of Fibre to provide Resilient Connectivity to Underground Areas

STFC Boulby lab operates at Boulby mine – a working Polyhalite and Salt Mine run by ICL-UK in the North East of England. This optical fibre installation work will install a secondary cable in the main mine shaft and two further cables underground, one attached to the roof of the mine tunnel between the existing laboratory and the new site and the second in a channel in the floor of the mine tunnel between the two locations. This will provide a diverse network with built in redundancy should one cable be damaged.

Buyer

UKRI

Value

£189,968

Published

7 Feb 2023

Closes

7 Feb 2023

Procurement details

Source

Find a Tender

Region

Swindon

Procurement method

Limited

Category

Goods

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

32561000

Fibre-optic connections

Lots

Lot 1 UKRI-2862 Installation of Fibre to provide Resilient Connectivity to Underground Areas

£189,968

This project will provide a network connection to a new area of the mine which will allow an increase in experimental opportunity for the laboratory. The project will also include the installation of a replacement fibre down the 1.1km main access shaft at Boulby. This requires the installing contractors to be trained to a level acceptable to ICL-UK to be abl...