ID Pilot Multifuel Reheat Furnace
The Institute is looking to issue tender invitations for a turnkey design and build Pilot Scale Reheating Furnace, sized approx ID 2x2x3m, and installed within the Institute's Normanton Pilot Plant Building. The furnace should be capable of demonstrating the substitution of natural gas with hydrogen for reheating iron and steel stock as well as other metals, i.e., capable of controlled heat up and hold around 1200OC and beyond. To further ensure that you fully grasp the requirements of such an installation, we ask...
Buyer
MATERIALS PROCESSING INSTITUTE
Value
Not provided
Published
14 Feb 2023
Closes
24 Feb 2023
Procurement details
Source
Find a Tender
Region
South Teesside
Procurement method
Open
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
42000000
Industrial machinery
Lots
Lot 1 ID Pilot Multifuel Reheat Furnace
Value not provided
The Institute is looking to issue tender invitations for a turnkey design and build Pilot Scale Reheating Furnace, sized approx ID 2x2x3m, and installed within the Institute's Normanton Pilot Plant Building. The furnace should be capable of demonstrating the substitution of natural gas with hydrogen for reheating iron and steel stock as well as other metals,...
Delivery: North East (England)
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.